In industrial applications where the PLC will replace the relay logic circuit, the operator controls and process switches will generally remain as they are wired.
Correct Answer:
Verified
Q1: The compilation of all available instructions for
Q2: Through a sophisticated system of digital signal
Q4: The time required for the PLC
Q5: The input signal must be converted to
Q6: The most common PLC programming language used
Q7: The only devices in the decision maker
Q8: Volatile memory will lose its programmed contents
Q9: By definition, _ devices are all devices
Q10: A PLC system offers many advantages over