If the load requirements of a single-phase installation are greater than the serving agency normally supplies through one service, ____ are permitted.
A) additional agencies
B) multiple branches
C) service disconnects
D) multiple services
Correct Answer:
Verified
Q3: The vertical clearance above roof level must
Q4: If each feeder is 100 amperes, the
Q5: All electric equipment must be _ to
Q6: The maximum distance to any receptacle, measured
Q7: Each occupant must have ready access to
Q9: _ is defined as the underground conductors
Q10: The conductors and equipment connecting the serving
Q11: A minimum of _ wall switch-controlled lighting
Q12: All 125-volt through 250-volt receptacles supplied by
Q13: _ is the maximum number of disconnects