Multiple Choice
Resource utilisation charts based on each activity's latest start time are said to be based on
A) availability times.
B) an as-late-as-possible (ALAP) schedule.
C) an as-soon-as-possible (ASAP) schedule.
D) a limited schedule plan.
Correct Answer:
Verified
Related Questions
Q1: Which of following would allow for level
Q2: In addition to showing the technical constraints
Q3: When several activities need the same limited
Q4: assist with the complexity of generating a
Q9: If resources are to be considered in
Q10: Why are activities drawn in a serial
Unlock this Answer For Free Now!