To draw a ____, start by drawing the activities in boxes in their logical sequence and connecting them with arrows to show the required dependent relationships, as the project should be performed from start to completion.
A) work breakdown structure
B) responsibility assignment matrix
C) acceptance criteria chart
D) network diagram
Correct Answer:
Verified
Q103: The _ shows all the individuals associated
Q104: An activity in a network diagram cannot
Q105: Standard subnetworks should be developed for those
Q106: A network diagram is a tool for
Q107: The _ is a roadmap that displays
Q109: _ contains a small number of higher-level
Q110: Each activity in a network diagram is
Q111: Activities should _ the time intervals at
Q112: Arrows linking the activity boxes in a
Q113: In preparing a network diagram, drawing activities
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents