__________ is the amount that must be subtracted from a desired stub-up height so the bend will come out right.
A) Sweep
B) Stub height
C) Saddle mark
D) Take-up
Correct Answer:
Verified
Q16: A(n) _ bend is a conduit bend
Q17: Schedule 80 rigid PVC conduit has a
Q18: The NEC requires that a(n) _ be
Q19: A separate equipment grounding conductor must always
Q20: Electricians often refer to Type RMC as
Q22: The number of bends in a conduit
Q23: Types RMC, IMC, EMT, and PVC come
Q24: The metric designator for 6-inch trade-size rigid
Q25: A steel fish tape should be used
Q26: Three-point and four-point bends are types of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents