The risk management of an event takes place in several linked stages:
A) first, the assessment; second, the evaluation.
B) first, the assessment; second, the control measures.
C) first the evaluation; second, the control measures.
D) Firs first, the assessment; second, the evaluation; third, the control measures.
Correct Answer:
Verified
Q2: Event managers need to have an understanding
Q3: The risk that an event cannot be
Q4: Requirements Risk is the risk which is:
A)not
Q5: When a location/venue has a poor reputation
Q6: The traffic plan for an event usually
Q8: High-probability and low-severity risks should be:
A)avoided.
B)minimised.
C)controlled.
D)insured.
Q9: The venue evaluation for an event usually
Q10: Event organisers need to balance by offering:
A)creative
Q11: The risk cascade is when:
A)a risk event
Q12: In the case of the Environmental Risk,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents