Myra Operates a Punch Press on a Production Line

Question 100

Multiple Choice

Myra operates a punch press on a production line.Because she is slower than the operators both before and after her in the process, work stacks up at her press.This is known as a _________:


A) bottleneck
B) constraint
C) defect
D) hazard

Correct Answer:

verifed

Verified