The building drain
A) receives the discharge from soil, waste, and other drainage piping inside the walls of a building.
B) is the lowest part of the drainage system.
C) conveys all discharge to the building sewer.
D) all of the above.
Correct Answer:
Verified
Q5: A dead end is an extension of
Q6: When installing a buiding drainage system, it
Q7: No connections should be made to a
Q8: The minimum satisfactory velocity in a drain
Q9: If the building drain is buried in
Q11: _ intercept and retain greasy and oily
Q12: Cleanouts or cleanout equivalents must be located
Q13: Building _ may be permitted to use
Q14: If fixtures are subject to backflow, they
Q15: _ is caused when fast-moving waste from