The slope of the building sewer (sizes through 6 inches) should not be less than 1/8 inch per foot.
Correct Answer:
Verified
Q10: Private sewage disposal systems are used for
A)
Q11: What is the first consideration when sizing
Q12: A septic tank is a watertight vessel
Q13: Which of these processes occurs last in
Q14: The materials in sewage that are inactive
Q16: The building sewer is located inside the
Q17: Sewage is
A) the process of breaking down
Q18: The building sewer begins where the sewer
Q19: Septic tanks should be installed as deep
Q20: Organic materials are
A) carbon-based compounds.
B) broken down