Cleanouts are required by most codes at
A) the connection of the building drain and at specified intervals along the sewer line.
B) the connection of the building drain only.
C) specified intervals along the sewer line and at the septic tank.
D) anywhere along the sewer line.
Correct Answer:
Verified
Q3: For residential applications, septic tank size is
Q4: The outlet of a septic tank should
Q5: The six steps in public water treatment
Q6: At least 50' should be between any
Q7: Sewer pipe should be uniformly supported on
Q9: The minimum septic tank size should be
Q10: Private sewage disposal systems are used for
A)
Q11: What is the first consideration when sizing
Q12: A septic tank is a watertight vessel
Q13: Which of these processes occurs last in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents