Multiple Choice

In an operating system, processes A / B / C have the following maximum designed capacity: A = 1700 units / B = 1650 units / C = 1800 units. If the actual measured output is 1400 units, what is the
System efficiency?


A) 105%
B) 95%
C) 75%
D) 85%
E) 90%