To meet the requirements of NEC 110.9 and 110.10, it is absolutely necessary to determine the available fault currents at various points on the electrical system.If a study is not done, the selection of overcurrent devices may be in error, resulting in a hazard to life and property.
A) short-circuit
B) transformer multiplier
C) line-to-line voltage
D) line-to-line wattage
Correct Answer:
Verified
Q1: What is the importance of selective coordination?
Q3: _ can prevent the occurrence of single
Q5: The actual impedance value on a UL-listed
Q9: The amount of available short-circuit current decreases
Q9: If noncurrent-limiting overcurrent devices (standard molded-case circuit
Q12: The amount of short-circuit current from a
Q13: The transformer multiplier M2 is calculated by
Q13: _ power systems are power systems that
Q17: To obtain the approximate short-circuit current values
Q17: What should you keep in mind when
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents