NEC 701.12(E) the connection for a legally required standby system to be made ahead of, but not within, the main service disconnect.
A) mandates
B) disallows
C) permits
D) discourages
Correct Answer:
Verified
Q3: When are self-contained emergency power systems used?
Q4: Fuels that may be used in an
Q5: What is the mechanism behind the generation
Q6: According to NEC 700.6(A), a(n) is required
Q6: Why is it important to accurately determine
Q7: Manufacturers of generators, transfer switches, and signaling
Q8: The starting kilovolt-amperes for a motor is
Q12: In a typical branch-circuit installation for an
Q13: Many types of healthcare facilities are covered
Q14: What is a legally required standby system?