The primary goal of on-site detention is to reduce the peak rate of runoff leaving the site to a level equal to or less than the predevelopment peak rate.
Correct Answer:
Verified
Q1: When does most pollutant transport occur?
A)early in
Q2: A detention basin functions by storing water
Q3: Detention basins are designed to release stormwater
Q5: A basin designed to have a permanent
Q6: A non-structural strategy for mitigating the effects
Q7: Design storms should be chosen to reflect
Q8: In addition to controlling the quantity of
Q9: Off-site detention is intended to protect land
Q10: The first flow of runoff is called
Q11: Topographic conditions peculiar to individual sites have
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents