Solve the problem.
-A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 6% cement should he mix with 4 bags of 19.5% cement to produce a mix containing 9% cement?
A) 23 bags
B) 18 bags
C) 14 bags
D) 16 bags
Correct Answer:
Verified
Q71: Solve the problem.
-Ron and Kathy are ticket-sellers
Q72: Solve the problem.
-A woman made a deposit
Q73: Solve the problem.
-Tim and Judy mix two
Q74: Solve the problem using the elimination method.
-The
Q75: Solve the problem using the elimination method.
-The
Q77: Solve the problem.
-Mardi received an inheritance of
Q78: Solve the problem using the elimination method.
-In
Q79: Solve the problem using the elimination method.
-The
Q80: Solve the problem using the elimination method.
-A
Q81: Solve.
-x + 5y + 2z = 1
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents