Set up the linear programming problem.
-A steel company produces two types of machine dies, part A and part B and is bound by the followingconstraints:∙ Part A requires 1 hour of casting time and 10 hours of firing time.∙ Part B requires 4 hours of casting time and 3 hours of firing time.∙ The maximum number of hours per week available for casting and firing are 100 and 70, respectively.∙ The cost to the company is $0.75 per part A and $3.00 per part B. Total weekly costs cannot exceed $45.00.Let x = the number of part A produced in a week and y = the number of part B produced in a week. Writea system of three inequalities that describes these constraints.
A)
B)
C)
D)
Correct Answer:
Verified
Q383: Write the word or phrase that best
Q384: Write the word or phrase that best
Q385: Set up the linear programming problem.
-A dietitian
Q386: Write a system of linear inequalities that
Q387: Set up the linear programming problem.
-A dietitian
Q389: Write the word or phrase that best
Q390: Write a system of linear inequalities that
Q391: Write a system of linear inequalities that
Q392: Write the word or phrase that best
Q393: Write the word or phrase that best
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents