Solve the problem.
-A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 7% cement should he mix with 3 bags of 37% cement to produce a mix containing 12% cement?
A) 17 bags
B) 23 bags
C) 15 bags
D) 18 bags
Correct Answer:
Verified
Q128: Solve the problem.
-Martha can rake the leaves
Q129: Solve the problem.
-A chemist makes a mixture
Q130: Solve the problem.
-Tim and Judy mix two
Q131: Solve the problem.
-Liz ran 30 mi, 34
Q132: Solve the problem.
-An experienced accountant can prepare
Q134: Solve the problem.
-Anne and Nancy use a
Q135: Solve the problem.
-A merchant has coffee worth
Q136: Solve the problem.
-One maid can clean the
Q137: Solve the problem.
-Frank can type a report
Q138: Solve the problem.
-In a chemistry class, 4
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents