Solve the problem.
-A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 9% cement should he mix with 10 bags of 10.8% cement to produce a mix containing 10% cement?
A) 23 bags
B) 10 bags
C) 8 bags
D) 18 bags
Correct Answer:
Verified
Q63: Solve the problem.
-There were 670 people at
Q72: Solve the problem using the elimination method.
-The
Q74: Solve the problem.
-A merchant has coffee worth
Q76: Solve the problem.
-Mrs. Boyd has a desk
Q78: Solve the problem.
-Ellen wishes to mix candy
Q79: Solve the problem.
-Ron and Kathy are ticket-sellers
Q79: Solve the problem.
-In a chemistry class, 6
Q80: Solve the problem.
-Andy has 33 coins made
Q81: Solve.
-x + 2y + 2z = 0
Q82: Solve.
-5x + 4y + z = 34
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents