Solve.
-It takes 9 hours for 8 people to paint a house. How long will it take 2 people to do the job?
A) 2.5 hr
B) 32.4 hr
C) 36 hr
D) 2.3 hr
Correct Answer:
Verified
Q179: Solve.
-The distance D that a spring is
Q180: Find the equation of variation if the
Q181: Solve.
-The current I in an electrical conductor
Q182: Solve.
-The amount of tread left on a
Q183: Find an equation of variation in which
Q185: Solve.
-The volume V of a gas varies
Q186: Solve.
-The gravitational attraction A between two masses
Q187: Solve.
-The time T necessary to make an
Q188: Solve.
-The weight that a horizontal beam can
Q189: Find an equation of variation in which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents