Multiple Choice
The ____ (vertical part through the floor) and drain basin are usually set at the proper elevation just prior to placing the concrete floor.
A) riser
B) pole
C) climber
D) elevation
Correct Answer:
Verified
Related Questions
Q1: At one time, clay drain tile was
Q3: _ pipe is used in most new
Q4: The thickness of polyethylene sheeting is measured
Q5: For vapor barriers, _-mil polyethylene is generally
Q6: The weight and rigidity of the floor
Q7: One mil equals 1/_ of an inch.
A)
Q8: Ground water is kept away from the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents