A band joist, or ____, is bolted to poles when constructing pole buildings.
A) foundation
B) wracking
C) sheathing
D) header
Correct Answer:
Verified
Q12: Wracking can be prevented by _.
A) avoiding
Q13: In balloon framing, floor framing at intermediate
Q14: In areas where hurricanes and high tides
Q15: The advantages of structural integrated panels (SIPs)
Q16: Post-and-beam framing is _.
A) never left exposed
B)
Q18: Pole buildings are a variation of _
Q19: In pure post-and-beam construction, the exterior walls
Q20: The bottoms of the studs are held
Q21: When installing nonmetallic-sheathed cable through wood wall
Q22: In conventional framing, _ pieces are used