Which of the following actions would require the company to obtain a permit for discharge from the EPA?

Which of the following actions would require the company to obtain a permit for discharge from the EPA?


A) Releasing water back into a stream after it was used in production with the only change being its temperature.
B) Releasing water back into a stream after it was used in production, but in a state cleaner than it entered the factory.
C) Releasing water into a pond on company property.
D) Releasing water from a power plant cooling tower into the ocean.
E) All of the above would require an EPA permit.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents