Whenever it is possible, the contractor will use the material excavated at the site for backfill requirements.
Correct Answer:
Verified
Q1: Changes in productivity should be dealt with
Q2: Pit and sump excavation is mostly performed
Q3: Backfill material that is compacted will be
Q4: The _ is an allowance for the
Q5: A large-size excavation company is generally equipped
Q7: Generally a large project causes crews and
Q8: _ are used when loads that are
Q9: The cost of transporting equipment includes the
Q10: Material prices for backfill have three main
Q11: Tracking productivity rates separately from prices also
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents