Finishes are first classified in terms of what is being finished; they are then separated by type of finish.
Correct Answer:
Verified
Q8: Concrete is classified in terms of the
Q9: Where there is an opening in a
Q10: Welded wire mesh shall be measured in
Q11: Expansion joints are measured in _, stating
Q12: Linear inserts such as waterstops are measured
Q14: Because only the _ of formwork is
Q15: Deduct for openings in the concrete that
Q16: Preparing a quantity takeoff of concrete work
Q17: Saw cuts for concrete are measured in
Q18: Concrete shall be measured in _ net
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents