A Water Bottle Manufacturing Plant Uses a Three-Step Procedure to Produce

Question 32

Multiple Choice

A water bottle manufacturing plant uses a three-step procedure to produce each unit of bottle.The first step is casting,which needs 35 workers to operate the furnace.The second step is quenching,which needs 35 workers.At the third step,bottles are prepared for dispatch in the assembly line with the help of 70 workers.If the factory produces 14,000 bottles per day,then the productivity of labor in the factory is equal to _____.


A) 200 bottles per worker
B) 400 bottles per worker
C) 100 bottles per worker
D) 140 bottles per worker
E) 220 bottles per worker

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents