A water bottle manufacturing plant uses a three-step procedure to produce each unit of bottle.The first step is casting,which needs 35 workers to operate the furnace.The second step is quenching,which needs 35 workers.At the third step,bottles are prepared for dispatch in the assembly line with the help of 70 workers.If the factory produces 14,000 bottles per day,then the productivity of labor in the factory is equal to _____.
A) 200 bottles per worker
B) 400 bottles per worker
C) 100 bottles per worker
D) 140 bottles per worker
E) 220 bottles per worker
Correct Answer:
Verified
Q27: Which of the following does not contribute
Q28: The movement from point A to point
Q29: If a nation moves upward along its
Q30: If increases in capital per worker lead
Q31: An improvement in the quality of capital
Q33: The figure below shows three different per-worker
Q34: The slope of the per-worker production function
Q35: The law of diminishing marginal returns states
Q36: The figure below shows three different per-worker
Q37: Which of the following would increase labor
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents