When joining steel pipe, a ____ should be applied to the threads before connecting.
A) pipe dope
B) flux
C) solder
D) gasket
Correct Answer:
Verified
Q2: The size indicated for the diameter of
Q3: The proper type of flame from an
Q4: K-type copper is heavy duty with a
Q5: DWV copper stands for drain, waste and
Q6: For cleaning ACR copper tubing before soldering,
Q8: M is a lightweight copper and is
Q9: When soldering or brazing, the solder is
Q10: L-type copper is considered medium weight and
Q11: Filler materials used in the high temperature
Q12: Pipe threads, when used on pipe that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents