The NEC requires that switching be done only in ____ conductors.
A) ungrounded
B) designated
C) black
D) red
Correct Answer:
Verified
Q9: Describe what NEC 250.148 requires to maintain
Q10: Name at least four kinds of lighting
Q11: When terminating a receptacle, the white (grounded)
Q12: The conductors that run between a switched
Q13: Phase conductors 6 AWG and smaller _
Q15: When is a reidentified white conductor NOT
Q16: In older existing installations, where an equipment
Q17: To avoid inductive heating in metallic raceways,
Q18: All 125-volt, 15- and 20-ampere receptacles in
Q19: Alternating current, general-use snap switches are UL-listed
Unlock this Answer For Free Now!