Commonly used as exterior walls of a structure, ____ are poured into forms that have been built at the jobsite, but they are not in place.
A) security walls
B) shear walls
C) tilt-up walls
D) retaining walls
Correct Answer:
Verified
Q15: One of the two types of poured-in-place
Q16: One of the two types of poured-in-place
Q17: The first drawing in a set of
Q18: _ are used on poured-in-place concrete drawings
Q19: Used within poured-in-place concrete structures, _ are
Q21: In a slab designation 3S4, the number
Q22: A commonly used floor system in poured-in-place
Q23: The _ used with poured- in-place concrete
Q24: The _ is a poured-in-place concrete floor
Q25: Name the two classifications of poured-in-place concrete
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents