The passive yaw brake plungers should always be torqued to their final level in a sequential pattern after inspection.
Correct Answer:
Verified
Q5: The machine head includes components such as
Q6: Visual inspection of the yaw drive sytem
Q7: Maintenance activities within the wind turbine machine
Q8: Disposing of waste lubricant around the tower
Q9: Processes used to fabricate the bed plate
Q10: It is not necessary to review the
Q11: Yaw brake designs fall into two catagories:
Q13: Documenting each activity during a PM cycle
Q14: Non-destructive test methods may include: magnetic particle,
Q15: Inspection and maintenance of the power conversion
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents