The PC enables the wind farm SCADA system to comunicate with the wind turbine PLC.
Correct Answer:
Verified
Q5: A tower foundation rod "strike test" should
Q6: Cooling systems utilized with power electronics may
Q7: Wind turbine foundations are generaly rock anchor
Q8: Verification of wind turbine control system safety
Q9: Inspection of DTA blind areas should be
Q10: The first step in a DTA control
Q11: The power conversion system for all wind
Q12: Preventative maintenance activites for the DTA may
Q14: Preventative maintenance activities for a PC may
Q15: Preventative maintenance activities for a UPS system