When concrete construction must be interrupted, a ____is used to provide a clean surface where work can be resumed.
A) construction joint
B) wire mesh
C) girder
D) expansion joint
Correct Answer:
Verified
Q1: A concrete slab is often used for
Q3: The crawl space is the area formed
Q4: When a slab is placed on more
Q5: The floor slab can be poured as
Q6: A _ is used to provide support
Q7: Which of these are used to span
Q8: The post-and-beam floor system is a popular
Q9: Slabs built above grade are most commonly
Q10: Friction between the slab and the soil
Q11: Concrete slabs can often be poured over