During the design process, what is the last thing you must you do before bubbling-in the entry, living, sleeping, and service areas?
A) note the orientation features for the building site
B) delineate the buildable area
C) complete the plot plan
D) calculate the square footage of the building site
Correct Answer:
Verified
Q16: Footings should be represented on the foundation
Q17: A well-planned design will have the entry
Q18: What are the four major areas of
Q19: The plot plan should identify the structure's
Q20: The architect/designer should know the amount and
Q22: A circle is the electrical symbol for
Q23: To determine the maximum square footage allowed
Q24: Imagine that you are looking at a
Q25: The roof slopes, chimney, plumbing vents, and
Q26: When preparing the roof plan, you should
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents