Division 2 describes work to be done on site, including Soil testing or core drilling or seismic exploration.
Correct Answer:
Verified
Q4: Division 2 includes
A) site work
B) Equipment
C) Mechanical
D)
Q5: Division 1 includes
A) Site work
B) Equipment
C) Mechnical
D)
Q6: Division 4 does not deal with the
Q7: Division 8 main ares of concern is
Q8: Division 4 deals with wood and plastics.
Q10: Division 7 contains written description of _
Q11: Metal roof decking is under division _.
Q12: The major subdivision included under Division 3
Q13: Division 5 deals with steel structures.
Q14: Division 15 deals with
A) Site work
B) Equipment
C)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents