Solved

A Contractor Needs to Grade the Slope of a Subdivision

Question 41

Multiple Choice

A contractor needs to grade the slope of a subdivision lot to place a house on level ground. (See the illustration.) The present slope of the lot is 10.5°. The contractor needs a level lot that is 106 ft deep. To control erosion, the back of the lot must be cut to a slope of 23.2°. How far from the street, measured along the present slope, will the excavation extend? Round your answer to the nearest foot. A contractor needs to grade the slope of a subdivision lot to place a house on level ground. (See the illustration.)  The present slope of the lot is 10.5°. The contractor needs a level lot that is 106 ft deep. To control erosion, the back of the lot must be cut to a slope of 23.2°. How far from the street, measured along the present slope, will the excavation extend? Round your answer to the nearest foot.   A)  184 ft B)  190 ft C)  196 ft D)  168 ft E)  210 ft


A) 184 ft
B) 190 ft
C) 196 ft
D) 168 ft
E) 210 ft

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents