On April 23, 2018, Trevors Mining entered into an agreement with the state of California to obtain the rights to operate a mineral mine in California for $12 million. Additional costs and purchases included the following: After the minerals are removed from the mine, the equipment will be sold for an estimated residual value of $60,000. The structures will be torn down. The mine is expected to produce 1,400,000 tons of ore. After the ore is removed, the land will revert back to the state of California. During 2018, Trevors extracted 210,000 tons of ore from the mine. What total amount would be charged to depletion of the mine and depreciation of the mining equipment and structures for 2018, assuming that Trevors uses the units-of-production method for both depletion and depreciation? (Round your final calculations to the nearest whole thousand dollars.)
A) $2,601,000.
B) $2,520,000.
C) $2,610,000.
D) $2,565,000.
Correct Answer:
Verified
Q58: Archie Co. purchased a framing machine for
Q59: On September 30, 2018, Bricker Enterprises purchased
Q60: Gains on the cash sales of property,
Q61: On March 31, 2018, M. Belotti purchased
Q62: An asset was acquired on September 30,
Q64: Short Corporation acquired Hathaway, Inc., for $52,000,000.
Q65: Granite Enterprises acquired a patent from Southern
Q66: Natural resources that have been harvested but
Q67: An asset was acquired on October 1,
Q68: Intangible assets that have an indefinite useful
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents