A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt's effort requiring that the average cost of an internal critical raw material component be less than or equal to $3,800 in order to stay within budget. Using a sample of 38 first article components, a Mean of the new product upgrade price of $3,680, and a Standard Deviation of $120 was estimated. In order to increase the Long Term Z value to 5, what is the maximum long term variation in pricing the Belt can accept for his upgraded critical raw material component?
A) $6
B) $12
C) $24
D) $48
Correct Answer:
Verified
Q32: The validity of the decision made with
Q33: For a Normal Distribution as samples size
Q34: The Normal Distribution is considered to be
Q35: A Belt working in a supply chain
Q36: Time is always the metric on the
Q38: Sally and Sara sell flower pots at
Q39: When conducting a Hypothesis Test using Continuous
Q40: A Belt is analyzing data and upon
Q41: Relative to a Design of Experiments the
Q42: If an experiment has 5 factors and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents