If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?
A) Improve the lighting to assure adequate visibility
B) Confirm a Visual Factory exists to assure proper communication of status of machines
C) Implement Kanbans to assure enough inventory for the process step
D) Reword the standardized work instructions to use active verbs and not passive phrases
Correct Answer:
Verified
Q56: An operator is measuring the distance between
Q57: When we compare short-term and long-term Capability
Q58: Which statements are correct about the advanced
Q59: An operator checks that all boxes being
Q60: The reported Cpk for a process with
Q62: If you can Poka-Yoke a defect out
Q63: The Hardware Store ordered ten lawn mower
Q64: One of the foundations of Lean Six
Q65: If a process has subgroups for Variable
Q66: When a Belt creates a Process Map
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents