You have just assumed management responsibility over an older network consisting of passive hubs and some layer 2 switches. The network is experiencing massive slow downs on an irregular basis. Which of the following is the MOST effective immediate solution to the problem?


A) Purchase and install layer 3 switching equipment.
B) Purchase and install a software based gateway.
C) Add bridges at key points in the network.
D) Segment your network into smaller domains.