Exhibit:
In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?
A) Installed one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
B) Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Install service drop to each boat slip.
C) Pre-cable each boat slip during construction.
D) For security, each install should be terminated in the patch panel/cross-connect at the dockmaster or marina office.
Correct Answer:
Verified
Q318: You are designing a cabling containment system
Q319: If you have a 30 cm (12
Q320: The _ system is an application used
Q321: Which type of protection for electrical power
Q322: Within a commercial office building of 2300
Q324: You are designing a multi-story dwelling and
Q325: Within building automation hardware systems, there is
Q326: You have just finished a design calling
Q327: If you are using a building automation
Q328: Which of the following is used to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents