Сonsider the following process flow from the Main Page of a process in Process Studio: Thinking about the standard Blue Prism Process Templates, what is wrong with this Main Page process flow?
A) There is nothing wrong with the Main Page flow shown in the image, it is a copy of Blue Prism's standard Process Template.
B) The Stop? decision stage should be removed from the process flow, as Stop times is configured either within the Scheduler or processes are stopped via Control Room.
C) The Main Page process flow is too high level. For better visibility of the process logic the flow steps hidden in the sub-pages should all be on the main page instead.
D) There is no exception handling on this Main Page so any exceptions that "bubble up" will cause the process to terminate rather than exceptions being handled correctly.
E) The Reset Global Data page is not required because sub-pages within a process should always use input and output parameters rather than global data items. There should be no global data to reset.
Correct Answer:
Verified
Q69: A process contains only 4 stages. Study
Q70: How can a session variable value be
Q71: Which of the following statements regarding the
Q72: Study the following process flow:
Q73: Study the following process flow on the
Q75: Which of the following flows can you
Q76: An action called 'Get Account details' fails
Q77: How can an environment variable value be
Q78: Which of the following comments about an
Q79: Which of the following indicates a case
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents