Response times in an HDP pool have been increasing consistently with each additional workload during a large scale migration. The response times may become unacceptable with subsequent migrations. The purchase of additional equipment is an acceptable solution. What are two valid actions in this scenario? (Choose two.)
A) Increase the pool free space and alert thresholds to the maximum permitted levels.
B) Expand the pool with volumes from new parity groups to reduce utilization levels.
C) Apply the SOM to provide tier property information that assesses suitability for HDT and deployment of flash.
D) Use more, smaller, pool LDEVs per parity group to improve the efficiency and utilization of the queues.
Correct Answer:
Verified
Q1: Your VSP G1000 customer has an HDP
Q2: You are sizing a storage system for
Q3: A VSP G800 HDT pool contains FMDs,
Q4: Immediately after migrating to a new HDT
Q6: Which three statements are true regarding the
Q7: A user with a diskless VSP G800
Q8: A customer has an HDP pool with
Q9: A customer has several Oracle databases with
Q10: Your customer has an HDP pool dedicated
Q11: A customer has a VSP G800 storage
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents