A maintenance window had been scheduled to allow for the upgrade of the firmware of one of the VSP switches in the ACP. However, steps were not taken to avoid receiving unnecessary notifications during this period. As a result, when the upgrade process started the VSP switch shows multiple critical alerts. At this point, what would a support engineer do to reduce the amount of these unwanted alerts?


A) Use the Post-Event Downtime feature in Orchestrator.
B) Use the Mass Acknowledgments feature in Orchestrator.
C) Use the Recurring Downtime feature in Orchestrator.
D) The engineer will have to wait for the upgrade process to complete.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents