A maintenance window had been scheduled to allow for the upgrade of the firmware of one of the VSP switches in the ACP. However, steps were not taken to avoid receiving unnecessary notifications during this period. As a result, when the upgrade process started the VSP switch shows multiple critical alerts. At this point, what would a support engineer do to reduce the amount of these unwanted alerts?
A) Use the Post-Event Downtime feature in Orchestrator.
B) Use the Mass Acknowledgments feature in Orchestrator.
C) Use the Recurring Downtime feature in Orchestrator.
D) The engineer will have to wait for the upgrade process to complete.
Correct Answer:
Verified
Q6: As part of the upgrade of a
Q7: When performing a BIOS or firmware upgrade
Q8: A maintenance window has been scheduled to
Q9: To view a graphical representation of the
Q10: As part of a routine weekly maintenance
Q12: A support engineer is assigned to provide
Q13: Which functionality does Management Server Console (MSC)
Q14: To get a visualization of the hardware
Q15: A support engineer is planning to migrate
Q16: A support engineer is upgrading a PodFX
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents