A support engineer is tasked with upgrading a CPOD 2.1 system to ACP 4200 4.0. Which statement about the upgrade process is true?


A) Upgrading a CPOD 2.1 system to ACP 4200 4.0 is supported, and a direct upgrade path is supported.
B) Upgrading a CPOD 2.1 system to ACP 4200 4.0 is supported only if the Rack enclosure is replaced with a new 48 Inch Deep Model.
C) Upgrading a CPOD 2.1 system to ACP 4200 4.0 is not supported.
D) Upgrading a CPOD 2.1 system to ACP 4200 4.0 is supported, but a direct upgrade path is only partially supported.