An Isilon customer has two 5-node clusters; one for production and one for disaster recovery (DR) . The customer's workflows are replicated to the DR cluster through SyncIQ on individual schedules. They shutdown their production cluster for a scheduled DR test, failed over to the DR cluster, and continue their DR testing. Assume both clusters have identical shares, exports, and user authentication and that the client applications have been stopped and the DNS re-pointed. What is the correct method to continue production operations?
A) Revert the SyncIQ Policy
B) Initiate Manual Failback of the SyncIQ Policy
C) Initiate Automated Failback of the SyncIQ Policy
D) No change to the SyncIQ Policy
Correct Answer:
Verified
Q82: Which block size does Isilon SyncIQ use
Q83: You meet a customer for the first
Q84: At a minimum, how many connected and
Q85: You are asked to size a cluster
Q86: In Isilon OneFS, what is the snapshot
Q88: An Isilon customer created a SyncIQ policy
Q89: A customer is considering moving their NAS
Q90: What is the maximum volume or aggregate
Q91: If a file is 4 KB in
Q92: Traditional NAS storage architecture deploys simple two-way
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents