There is a concern that there are not enough physical switch ports available for the Isilon cluster in a new implementation with SMB and ICAP requirements. What course of action should be taken?
A) Team the NICs across the nodes and just add one connection to minimize the ports required.
B) The customer needs to provide more switch ports for the implementation
C) Create a SmartConnect zone across all ports but do not connect all of them
D) Leave the archival nodes off the external network switch to save switch ports
Correct Answer:
Verified
Q133: Which service daemon do FTP and FTPS
Q134: Which tool is used to perform a
Q135: What is the maximum number of data
Q136: There is a need to carry out
Q137: What is an accurate statement when configuring
Q139: How many files can reference a single
Q140: You have received a critical task that
Q141: Which type of deduplication is used to
Q142: When designing a SmartConnect IP pool, what
Q143: If SmartPools is unlicensed on a cluster,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents