After completing the initial root-to-root system migration, you are ready to switch over to the new target system. You have been performing some critical backups of key systems during this initial replication phase. Which key step must be done prior to the final switchover to ensure all backups are present on the target?
A) Perform a final catchup replication
B) Perform all required DNS changes
C) Run an MCS flush on the target
D) Run an MCS flush on the source
Correct Answer:
Verified
Q136: By default, what does the asktime utility
Q137: The average daily data added to an
Q138: How does EMC Avamar differ from traditional
Q139: Which level of granularity is used by
Q140: What is the software label for port
Q142: A RecoverPoint administrator is planning to use
Q143: To determine whether physical or virtual RPAs
Q144: A RecoverPoint administrator is failing over a
Q145: What is the recommended wait period before
Q146: Which type of RecoverPoint Consistency Group contains
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents