An EMC Project Manager asks you to provide a deliverable that documents all details of an EMC Avamar server implementation. Which deliverable is used?
A) TS-Kit Configuration Guide
B) TS-Kit Test Plan
C) SVC Qualifier
D) Statement of Work
Correct Answer:
Verified
Q17: What is the maximum number of backups
Q18: Garbage collection is running on an EMC
Q19: On an EMC Avamar server, the maintenance
Q20: Which factor(s) impacts the EMC Avamar checkpoint
Q21: A node has failed on a multi-node
Q23: Which command is used to convert new
Q24: Which Information is required when registering an
Q25: An EMC Avamar backup administrator is logged
Q26: By default, where are the cache files
Q27: For an Avamar Gen4 single node, how