You have deployed two data centers that require a Layer 2 stretch between host1 and host2.
Referring to the exhibit, what does a Layer 2 stretch require?
A) a VXLAN tunnel originating on the Super Spine Layer in DC1 to the Super Spine Layer in DC2.
B) a VXLAN tunnel originating on VTEP1 to VTEP2.
C) a VXLAN tunnel originating on the Spine Layer in DC1 to the Spine Layer in DC2.
D) a VPLS WAN connection between data centers.
Correct Answer:
Verified
Q19: Which two statements define the use of
Q26: Referring to the exhibit, each node in
Q27: Which protocol replicates forwarding information between MC-LAG
Q28: You are creating a new EVPN and
Q29: You have configured a new MC-LAG connection
Q30: You have a site with thousands of
Q31: Devices spine1 and spine2 have been configured
Q33: Which EVPN route type prevents BUM traffic
Q34: You have deployed a VXLAN as shown
Q35: Referring to the exhibit, what would cause
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents