Solved

After Installation or Replacement of a Cisco UCS C-Series Rack-Mount

Question 39

Multiple Choice

After installation or replacement of a Cisco UCS C-Series Rack-Mount Server, the host does not boot.   Which four options should be verified? (Choose four.)


A) Verify the power source to the equipment.
B) Check for loose HDD cables.
C) Reseat the DIMMs, CPU, and PCI cards.
D) Verify that power supplies are receiving power.
E) Reseat the mezzanine card connector.
F) Check the CPU sockets for bent pins.
G) Check the Cisco IMC for fan faults.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents