Solved

Refer to the Exhibit

Question 206

Multiple Choice

  Refer to the exhibit. A network administrator assumes a task to complete the connectivity between PC A and the File Server. Switch A and Switch B have been partially configured with VLANs 10, 11, 12, and 13. What is the next step in the configuration? A)  Add PC A to VLAN 10 and the File Server to VLAN 11 for VLAN segmentation B)  Add VLAN 13 to the trunk links on Switch A and Switch B for VLAN propagation C)  Add a router on a stick between Switch A and Switch B allowing for Inter-VLAN routing D)  Add PC A to the same subnet as the File Server allowing for intra-VLAN communication Refer to the exhibit. A network administrator assumes a task to complete the connectivity between PC A and the File Server. Switch A and Switch B have been partially configured with VLANs 10, 11, 12, and 13. What is the next step in the configuration?


A) Add PC A to VLAN 10 and the File Server to VLAN 11 for VLAN segmentation
B) Add VLAN 13 to the trunk links on Switch A and Switch B for VLAN propagation
C) Add a router on a stick between Switch A and Switch B allowing for Inter-VLAN routing
D) Add PC A to the same subnet as the File Server allowing for intra-VLAN communication

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents